server s311 r2games nick vajup
How is it possible to miss a date of dw? The last dw I made was on November 5 in the period 2,3,4,5 and then an incorrect period appears with days 5,6,7,8 and the correct one should be 6,7,8,9, and the aparace already a correct date that is 10,11,12,13 and is programmed by default on day 10, but in the incorrect period of 5,6,7,8 try to schedule dw on day 7 and program and order the capture of the registration of the alliance to corroborate and today it was scheduled not to let me go to dw that the event had not yet begun because according to the next date is November 10 but if dw is every 4 days and the last one I made was day 5 of November would be more than 4 days and a dw is lost, how would those 900k points in tycon that I lost compensate?
How is it possible to miss a date of dw? The last dw I made was on November 5 in the period 2,3,4,5 and then an incorrect period appears with days 5,6,7,8 and the correct one should be 6,7,8,9, and the aparace already a correct date that is 10,11,12,13 and is programmed by default on day 10, but in the incorrect period of 5,6,7,8 try to schedule dw on day 7 and program and order the capture of the registration of the alliance to corroborate and today it was scheduled not to let me go to dw that the event had not yet begun because according to the next date is November 10 but if dw is every 4 days and the last one I made was day 5 of November would be more than 4 days and a dw is lost, how would those 900k points in tycon that I lost compensate?
Comment